[1]
L. Xixing and L. Yi, “Approach of Solving Dual Resource Constrained Multi-Objective Flexible Job Shop Scheduling Problem Based on MOEA/D”, Int. J. Onl. Eng., vol. 14, no. 07, pp. pp. 75–89, Jul. 2018.